Dropped kerb applications · UK-wide

Safer access.
A clearer application.

Site drawings and technical support for proposed vehicle crossovers and dropped-kerb applications to local highway authorities.

UK-wideNationwide support
Clear scopeDefined deliverables
PracticalProject-led design
DirectProfessional guidance
Plan the vehicle crossover

A dropped kerb must work for the property, pavement and highway.

A vehicle crossover application needs to explain where access is proposed and how it relates to the frontage, parking area, highway, street furniture and drainage. We prepare clear site information for the agreed authority process.

The design is developed around the available dimensions and local requirements, without assuming that approval will be granted.

Frontage review
Clear scaled drawings
Access coordination
Application-ready information
What we provide

Drawing and design support for vehicle-access applications

Local-authority requirements vary, so the information is matched to the site and agreed application route.

01

Initial Feasibility

Review of frontage width, parking arrangement and obvious physical constraints.

02

Existing Site Plan

Scaled information showing the property, pavement, kerb and relevant street features.

03

Proposed Access Plan

Clear layout of the crossover, access width and on-site parking arrangement.

04

Visibility & Safety

Relevant relationship with junctions, pedestrian routes and highway visibility.

05

Levels & Drainage

Consideration of gradients, surface-water flow and the proposed hardstanding.

06

Application Drawings

The agreed drawing set organised for the relevant authority submission.

Your project package

Clear site information for the highway authority

Deliverables depend on local requirements, available survey information and the agreed scope.

A

Location plan

The property and surrounding highway context identified clearly.

B

Existing frontage

Current kerb, pavement, boundary and relevant features recorded.

C

Proposed crossover

Access width, parking layout and proposed frontage changes shown.

D

Supporting notes

Relevant design assumptions and site considerations recorded clearly.

Simple process

Four clear steps from enquiry to delivery

01

Send the frontage

Share the address, clear photographs, dimensions and intended parking layout.

02

Review constraints

Street furniture, trees, junctions, levels and available width are considered.

03

Prepare drawings

Existing and proposed site information is developed at the agreed scale.

04

Issue the package

The drawings and supporting information are prepared for the authority route.

Key considerations

Important points reviewed before the design is finalised

The right route depends on the property, proposal and requirements of the relevant authority.

01

Highway safety

Proximity to junctions, crossings, bus stops and visibility can affect acceptability.

02

Street features

Trees, lighting columns, inspection covers and utility equipment may constrain access.

03

On-site parking

The property needs a practical parking area with suitable depth and safe access.

04

Drainage & surfacing

Hardstanding design should manage surface water and meet relevant local requirements.

Common questions

Dropped Kerb, clearly explained

Straight answers about scope, approvals and starting the project.

Is dropped-kerb approval guaranteed?

No. The highway authority decides the application based on its policies, safety requirements and the specific site.

What photographs should I send?

Send straight-on and angled views of the full frontage, pavement, kerb, proposed parking area and nearby street features.

Do I need planning permission as well?

Planning permission may be required in some circumstances, including certain classified-road or frontage situations. The site and local requirements must be checked.

Can a tree or lamp post be moved?

Relocation is controlled by the relevant authority or utility owner and cannot be assumed. Existing features should be identified early.

Do you construct the dropped kerb?

This service covers agreed design and application information. Highway construction must follow the authority’s approval and contractor requirements.

Ready to move your dropped kerb project forward?

Share the property details, photographs and intended work for a direct route to the right architectural service.